Buyer: Slovnaft a.s.
Construction: GS Slovnaft – Bratislava, Púchovská ulica – New Connection NN
Activity: Realization
Project manager: Ing. Štefan Litomerický
Start of the construction: march 2016
End of the construction: april 2016
Locality: Slovnaft a.s., Bratislava Púchovská street, k.ú. Bratislava
The purpose of this construction is a realization a new connection nn for a gas station. Initially the gas station was connected on a low voltage wiring from a production area distant cca 500 m, which was for its operation unsuitable. Due this fact, it was neccesary to ensure a new connection on a gas station for a low voltage wiring, so that CS would be autonomous in terms of electrical supply and so that connection would be in the shortest possible distance from the gas station.