Building: IKEA Components – the construction of manufacturing and warehouse spaces and a parking lot
Project manager: Michal Sojka
The beginning: 04.05.2016
The end: 30.04.2017
In May 2016, KAMI PROFIT signed a contract with IKEA Components, s.r.o. for the supervision of the construction of manufacturing & warehouse spaces and car parks in Malacky. The construction was of industrial halls with the area of 31 423 m2, the total area is 91 000 m2. The specialty of this building is an automated warehouse, which is also the largest and highest of its kind in Slovakia (height 31.5m). It was necessary to carry out a special piloting based on the typical complex bases in Záhorí.