Project: The reconstruction of GS MOL Ostrava, Rudná I
The range of works: the reconstruction of the shop and car wash, the replacement of RVI elements, replacement of the fuel dispensing pumps
The start of works: 3.4.- 9.5.2017
Project: The reconstruction of GS MOL Ostrava, Rudná I
The range of works: the reconstruction of the shop and car wash, the replacement of RVI elements, replacement of the fuel dispensing pumps
The start of works: 3.4.- 9.5.2017