Construction: SLOVNAFT PETROL STATION – BRATISLAVA, TOMÁŠIKOVA II – MAINTENANCE WORKS AND A CHANGE OF THE CAR WASH TECHNOLOGY
Location: SLOVNAFT PETROL STATION – BRATISLAVA, TOMÁŠIKOVA II
Construction commencement: 01/ 2020
Construction completion: 02/ 2020
Construction type: petrol station – car wash
Activity: Project management
Investor: SLOVNAFT, a.s.
Project manager: Ing. Tomáš Krutek, Ing. Andrej Žiška
Description of works:
The goal of the adjustment and maintenance works is the overall reconstruction and redesign – a renovation of the interior of the car wash within the petrol station. The construction adjustment works consist of a complete change of the car wash line, an addition of DEVI bands at the section gates, an addition of two heat emitting ceiling panels, a new floor layer, two ventilation openings in the walls of the car wash, a renewal of the car wash line together with the technology, a change of the lighting, an installation of four side line drains and further maintenance works.