Buyer: SLOVNAFT a.s.
Construction: Adjustment of the road (widening)- GS SLOVNAFT Záhorská Bystrica
Activity: General contractor of construction works
Project manager: Ing. Štefan Litomerický
Star of the construction work: 12.11.2015
End of the construction work: 30.11.2015
Locality: Záhorská Bystrica, Bratislava
Adjustment of the road approach GS is solving the adjustment of the entry and exit, so it suits the requirements of the freight traffic. Compacted areas will be completed if neccessary reconstructed due to the access for the trucks for the already existing object CSPH. Neighborhood land properties wont be limited by reconstruction of the entrance and exit GS. Asphalt layers of the roads with the wider communication will be overbuild. Drainage of the road is going to stay at the terrene. On the state road I/2 in the place GS will be renewed horizontal road marking. Only the entrance is designed – from the road I/2, to which was designed also a seperate turning lane in the direction to Stupava. Predicted amount of trucks is max. 30 per day which is max. 10% of the trucks turning to the direction from Stupava.